Rack and Stack: What It Involves and How to Prepare the Site

Rack and stack means fitting equipment into racks, cabling and labelling it. Here is what the work involves and how to get the site ready.

Hands sliding a server module into a rack in a data centre

Rack and stack is the physical part of installing IT equipment: unpacking servers, storage and network devices, fitting them into racks, connecting power and cables, and labelling everything so it can be found later. It sounds simple, but a rushed job causes problems that only show up months afterwards, such as unlabelled cables, blocked airflow or overloaded power circuits.

What the work usually includes

  • Checking delivered equipment against the order and recording serial numbers
  • Fitting rails and mounting equipment at the agreed rack positions
  • Connecting power and network cables and dressing them neatly
  • Labelling devices, cables and ports to the agreed scheme
  • Powering on and confirming that each device starts and shows the expected status
  • Photographing the finished racks and reporting what was done

Prepare the site before the engineer arrives

  • Confirm the rack space is free and has the height, in rack units, that the equipment needs.
  • Check power: the number and type of sockets, and that the circuits can carry the extra load.
  • Check cooling and airflow, and which way the equipment should face.
  • Agree the cable routes, the lengths needed and the labelling scheme.
  • Arrange access: who needs permits, escorts or inductions, and the visiting hours.
  • Book the delivery, name a person to receive the equipment and set aside a place to unpack it.

Write the plan down

A rack plan is a simple diagram or table that shows what goes where: the device, the rack, the position, the power feed and the network port at each end. With a plan, the engineer can work through it step by step and you can check the result against it afterwards. Without one, small guesses add up.

Common mistakes

  • Ordering rails or cables that do not match the equipment
  • Mixing up the front and back of the rack, so airflow works against the equipment
  • Putting heavy equipment high in the rack instead of low down
  • Skipping labels to save time
  • Forgetting small parts such as screws, cable ties and power leads

After the job

Ask for a short report with photos of each rack, the serial numbers and any problems found. Keep it with the rack plan so the next person starts from an accurate record.